Introduction
The machine is used for open width cotton fabric pre-shrinking process.
At the beginning of overfeed, the cotton fiber will be processed by steaming to increase the humidity and plasticity. Then the fabric will be widened and pre-shrinked in order to reduce shrinkage and get a good soft feature.
Some fabric could be used directly after drying machine processing, and you can get a stable size, qualified shrinkage and soft effect. If the fabric couldn't reach the standard, you can repeat the processing step and obtain satisfactory result. based on different fabric width, we can provide the following machine models:
FSLS-2200mm/2400mm (standard)/2600 mm
based on different heat sources, our machine adopt 3 heat methods:
Steam, Electricity + Oil, Circulation Conducting Oil
Our machine is mainly used for cotton and other natural fibers,
***The machine can NOT be used for synthetic fabrics.
Design DrawingRepresentative Type InformationBasic InformationModelFSLS2400NameCompactorApplicationTextile-finishing(shrinkage rate:4-5%)Suitable FabricOpen-witdh knitted Fabric,Pure cotton,wool,blended fabric(cotton content>65%)Technical DatesFelt Max. Width2400mmTentering Max. Width2600mmWorking Speed3-35m/minRail TypeStainless Steel+ GraphiteDimensionApprox. (14540*4100*3000mm)L*W*HWeightApprox. 12tCompressed Air0.35-0.6MPaTentering Working TypeHorizontal Circulating Chain(Stainless Steel Pin Plate &Holder,Pitch:60mm)Compacting TypeTest Instrument Felt Belt(Nomex)+ Hot Cylinder, Felt Belt Thickness:20-21mmCost &Consumptionheat source of Hot cylinderNoItemCylinder Max.TempSpecificationConsumption1Electricity heat conduction OiSensor l190ºIndustrial Robot ;CIndustrial Electricity25-54KWSaturated Steam for Steam BoxNoItemHydraulic Parts Max.TempSpecificationConsumption1Saturated Steam140ºC3-6Kg/cm²100-150kg/hElectricityNoItemSpecificationConsumption1Driving SystemMain Motor etcRelay & Contactor 21KWProduction Line and Other Products
Payment Terms
Payment Conditions:30% down payment by T/T and the balance payment should be TT or in irrevocable L/C at sight.
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.Any questions and requirments,contact us now!